Maritime InnovationMarine Engineering · Simulation · Collaboration
ELEN

TECHNICAL INSIGHTS / SHAFT LUBRICATION AND SEALING

Stern Tube Lubrication and Seal Oil Systems

Oil Circulation Pressure Relationships and Condition Monitoring

Stern tube lubrication connects shaft support with oil containment at the hull boundary. A useful investigation must distinguish bearing lubrication from the oil services associated with the forward and aft seals. We use the supplied DMS 2024A ID21 screen to define these functions and propose an investigation for maritime engineers, educators and simulator developers. The question is which observations distinguish circulation changes, oil loss and possible water ingress. No operating trial or measured result is reported here.

SYSTEM
Stern tube lubrication and seal oil
VISIBLE MODEL
DMS-2024A-2D V1.0 · ID21
TECHNICAL FOCUS
Oil circulation and pressure relationships
STUDY SCOPE
Proposed investigation
STERN TUBE LUBRICATION AND SEAL OILFUNCTIONAL MAP
Original functional map linking the stern tube lubrication function with the sump and two pump units, forward seal head tank, high and low aft seal tanks and external seawater boundary. Lines show functional associations. Valve selection, cross-connections and flow directions require verification. Examine the functional relationships and verification boundariesEnlarge diagram

Figure 1. Original functional map based on the labels and visible functions of ID21. Lines group functions; they do not establish hydraulic isolation, valve selection or actual flow directions. Detailed routing and cross-connections require verification. [2]

01 / CIRCUIT BOUNDARIES AND OIL FUNCTIONS

Circuit boundaries and oil functions

ID21 represents a separate system from main engine lubricating oil service. It shows a stern tube oil sump, two pump units, a forward seal oil head tank and high and low aft seal oil tanks. Transfer, filling and drain connections define interfaces with other services. These are identifiable elements, not evidence of the required pump combination or selected operating path. The original screen and the functional map accompany this study. [1, 2]

In a general oil lubricated arrangement, the aft seal separates the stern tube oil from seawater, limiting outward oil leakage and inward water entry. The forward seal contains oil at the inboard end. Manufacturer references describe these functions and arrangement variants; they do not identify the seal manufacturer, ring configuration or circulation method represented by DMS. Distinct functions do not establish hydraulic isolation between every branch. [3, 4]

An equipment inventory is not yet a verified flow map. Trace connections between pump suction and discharge, the tube, seal branches and return or drain destinations. Distinguish filling and transfer operations from continuous lubrication. The diagram groups visible functions and leaves selection and cross-connections for verification; its lines do not prescribe valve positions or flow directions. [2]

Authentic unaltered DMS-2024A-2D V1.0 ID21 SternTube LO System screen at simulator time 00:00:24. It shows the shaft, forward seal oil head tank, high and low aft seal tanks, two pumps and sump. Several readings are zero. Examine the authentic ID21 simulator screenEnlarge image

Figure 2. Original 1600 × 900 screen supplied by Nikolaos Diakakis on 28 October 2026, reproduced without alteration. N 0.0 and several P 0.0 and G 0.0 fields are visible. Units, operating condition and measurement meanings must be confirmed before interpreting the readings. [2]

02 / TANK ELEVATION AND PRESSURE RELATIONSHIPS

Tank elevation and pressure relationships

For a stationary liquid of constant density, the relation below uses surface pressure p₀, density ρ, gravitational acceleration g and vertical depth h. SI inputs give pressure in pascals. Pump effects and flow losses are excluded. [5]

p=p0+ρgh

SI   p and p₀: Pa   ρ: kg/m³   g: m/s²   h: m

It follows that deeper immersion increases seawater pressure at a seal, while a taller oil column increases its static contribution. These are physical inferences; the tank positions drawn on ID21 are not calibrated elevations. [2, 5]

A pressure comparison needs a common pressure reference, actual liquid levels, densities, the seal reference elevation and each tank's pressure boundary. Circulating conditions require the relevant pump and piping behaviour as well.

The Full Load and Ballast labels suggest a draught related selection to investigate. The DMS 2017 manual also distinguishes these conditions, but its valve wording is ambiguous. Verify valve identifiers, routing and selection logic in the installed model before specifying a changeover. No tank height or operating pressure is prescribed here. [1, 2]

03 / MONITORING AND COMPETING EXPLANATIONS

Monitoring and competing explanations

A useful record combines shaft speed and operating condition with oil temperatures, tank levels, pump state, valve state and supported pressure or flow measurements. Identify sensor locations, units and pressure references first. A pump running indication does not establish delivery to the intended branch, and a supply pressure reading does not directly measure bearing oil film condition. In the supplied snapshot, N 0.0 and multiple P 0.0 and G 0.0 fields cannot demonstrate stable operation under load. [2]

Interpret level trends alongside transfers, refilling, temperature and the available return paths. A falling level alone cannot locate an oil loss; a rising level alone cannot prove seawater ingress. In a physical installation, water contamination can compromise bearing lubrication. Establishing it needs suitable sampling and oil analysis, interpreted with the relevant equipment documentation. A simulated temperature or level is not a laboratory result, and contamination modelling must be confirmed before it becomes an experimental variable. [6]

Before attributing an abnormal trend to seal damage, check measurement identity and whether a transfer or operating change occurred. Compare observations from the same time interval. Where the model exposes no relevant measurement, report the hypothesis as unresolved instead of creating an inferred reading.

04 / PROPOSED SIMULATOR INVESTIGATION

Proposed simulator investigation

We propose a reference run after confirming the initial condition, shaft speed or load, selected tank, valve arrangement and pump configuration. Record the installed software identity and which measurements and alarms it actually represents. Define logging intervals, stopping criteria and restoration requirements with the instructor or technical partner. The DMS 2017 reference is a starting point for comparison with 2024A, not proof that their behaviour is identical. [1, 2]

Choose one disturbance only after confirming its exact model identity, permitted value or state and expected measurement points. If no suitable fault is represented, investigate supported operating changes or restrict the work to circuit analysis. Log the intervention and compare synchronised hydraulic, temperature and level trends against the reference. Explain alternative causes and unresolved observations. Restore the reference and repeat only with comparable starting conditions. This proposed method does not establish a shipboard operating sequence, a diagnostic threshold or a successful test outcome.

05 / TECHNICAL COLLABORATION

Technical collaboration

We invite maritime institutions, practising engineers and simulator developers to review the functional map and measurement plan. A useful first collaboration would establish which pressure relationships and fault responses the model can demonstrate, then agree a small pilot with shared interpretation criteria. Responsibilities, data permissions and the form of reporting should be settled before any joint investigation. Documented observations and limitations would then determine the next study, without implying manufacturer endorsement or validated performance.

TECHNICAL TERMINOLOGY

Terms used in this study

The glossary keeps bearing lubrication, seal oil services and pressure terms distinct.

Stern tube
Χοάνη ελικοφόρου άξονα
Stern tube bearing
Έδρανο χοάνης ελικοφόρου άξονα
Forward seal
Πρωραίο στεγανοποιητικό
Aft seal
Πρυμναίο στεγανοποιητικό
Seal oil
Έλαιο στεγανοποίησης
Header tank
Δεξαμενή στατικού ύψους
Oil sump tank
Δεξαμενή συγκέντρωσης ελαίου
Forced circulation
Εξαναγκασμένη κυκλοφορία
Hydrostatic pressure
Υδροστατική πίεση
Pressure difference
Διαφορά πίεσης
Draught
Βύθισμα
Oil film
Λιπαντικό υμένιο
Water ingress
Είσοδος νερού
Oil loss
Απώλεια ελαίου
Condition monitoring
Παρακολούθηση κατάστασης
Reference condition
Κατάσταση αναφοράς

REFERENCES

Sources and documentation

  1. [1]

    DMS 2017. Marine Engine Room Simulator Manual. Manual_Model_VLCC_7S80ME.docx. Section 2.7.2 ID21, document page 61, printed page 32. Reference manual; the valve wording requires comparison with the installed model.

  2. [2]

    Diakakis N. DMS 2024A 2D V1.0. ID21 SternTube LO System, simulator time 00:00:24. Screenshot supplied on 28 October 2026. This is the source of the authentic image and the equipment labels used in the functional map.

  3. [3]

    Wärtsilä. Sterntube seals propeller shaft seals General forward and aft seal functions; no DMS seal identification.

    Read the technical reference
  4. [4]

    Wärtsilä. Sterntube lubricating oil systems General arrangement variants; no operating procedure transferred.

    Read the technical reference
  5. [5]

    OpenStax. University Physics Volume 1. Section 14.1. Fluids Density and Pressure Equation 14.4, pressure at a depth in a stationary constant density fluid. The application to relative oil and seawater levels is an inference, not a DMS result.

    Read the technical reference
  6. [6]

    Wärtsilä Services business white paper 2017. Improved lifecycle efficiency with water lubricated stern tube solutions Page 3, risks of water contamination in oil lubrication. Historical general reference; numerical limits, market estimates, product comparisons and regulatory claims are not adopted.

    Read the technical reference

Verification required before a pilot

Confirm the installed version, valve routing, tank selection, pressure reference and units, sensor locations and supported measurements, alarms and disturbances. The diagram has no operating arrows. The authentic screen is unchanged. The proposed investigation reports no measured results and sets no equipment limits.

Web sources checked on 7 November 2026.